Chamber Furnace ELF 11/23B Basisregler E301

The picture may be different from the article and can include supply, which is not in the standard scope.

Chamber Furnace
(380 - 415 V -SR-three phase + N)

Uses 2 phases of a 3 phase and neutral power supply (extra cost option)

The picture shows an item from the same kind.
Size and outfit could be different to that type.

PID-Controller
one ramp to setpoint
99 hour process timer which can be programmed for a timed delay at the start of the process or used as a countdown timer.

Optional
Upgrade from 301 to CC-T1 touchscreen (00050670)
Over-temperature protection digital (OPTOTCF)
Description value
WEEE obligation: Yes
WEEE registration number: DE60125593